From 06159ccec1902905a505e9f6f7c1979e438bf9ee Mon Sep 17 00:00:00 2001 From: Anson Biggs Date: Mon, 6 Dec 2021 19:22:12 -0700 Subject: [PATCH] reorder content --- index.html | 80 ++++++++++++++++++++++++++++-------------------------- 1 file changed, 41 insertions(+), 39 deletions(-) diff --git a/index.html b/index.html index 3ca873b..ac676ea 100644 --- a/index.html +++ b/index.html @@ -130,43 +130,6 @@
-
-
-
-
-
- -
-
-
-
-

Operational Demonstration Results

-

- The experimental thrust curve shows that the four load cells - managed to match the thrust curve for the - Estes F15 - within 6.2 Newton Seconds or 13.2% of expected. Due to - multiple changes in project and scope LANDER initially chose - very cheap load cells since the test stand demonstration was - originally mean't to be a verification for much larger goals. - Acquiring usable data from the load cells ended up taking much - more time and resources than the team initially expected, but - thanks to proper risk mitigation the team was able to overcome - the challenge and find a real solution. -

-
-
-
-
-
-
@@ -186,8 +149,10 @@ The fully assembled system and the CAD of the system can be seen on the figure to the right. LANDER consists of 5 subsystems, Control Software, Avionics, Control Mechanisms, - Structure, and Test Stand. The test stand involves a complex - hardware in the loop computer simulation running on a + Structure, and Test Stand. These subsysems all come together + to produce a test stand capable of simulating a vehicle + landing on the lunar surface. The test stand involves a + complex hardware in the loop computer simulation running on a microcontroller.

@@ -228,6 +193,43 @@

+
+
+
+
+
+ +
+
+
+
+

Operational Demonstration Results

+

+ The experimental thrust curve shows that the four load cells + managed to match the thrust curve for the + Estes F15 + within 6.2 Newton Seconds or 13.2% of expected. Due to + multiple changes in project and scope LANDER initially chose + very cheap load cells since the test stand demonstration was + originally mean't to be a verification for much larger goals. + Acquiring usable data from the load cells ended up taking much + more time and resources than the team initially expected, but + thanks to proper risk mitigation the team was able to overcome + the challenge and find a real solution. +

+
+
+
+
+
+

Videos of the Operational Demonstration